Skip to product information
LoneStar Tracking Hidden GPS Tracker Device Yabby3 – 4G/5G Weatherproof Car, Trailer, Vehicle & Asset Tracking, Anti-Theft Satellite Tracking, Real-Time Location & Security(Low Cost Subscription Plan)
$214.42
Sale price
$214.42
Regular price
Shipping calculated at checkout.
About This
- HIDDEN CAR TRACKER DEVICE WITH EXCEPTIONAL BATTERY LONGEVITY: Our Vehicle GPS Tracker, powered by a mere 3 AAA batteries (included), can deliver an impressive battery performance. Battery Life Scenarios: Stationary Assets with Movement Detection Disabled: 9 Years, Stationary Assets with Movement Detection Enabled: 6 Years, Daily 2-hour Driving (In Motion): 1.4 Years. Be confident that your car, trailer, equipment, and assets remain safeguarded.
- CAR SECURITY GPS THEFT RECOVERY: With real-time location updates, our car security anti-theft GPS tracker ensures swift and effortless asset recovery. Activate recovery mode to instantly track your stolen vehicle, equipment, and other assets, providing added security and peace of mind.
- RELIABLE OUTDOOR GLOBAL COVERAGE: Trust in our GPS Locator with worldwide reach through GNSS and 4G Cat-M1 tech on AT&T and T-Mobile networks for automotive tracking devices. Manage high-value assets confidently with our GPS car tracker, ensuring reliability in every environment, perfect for use as auto tracker device for vehicles.
- SIMPLE INSTALLATION: The Yabby3 4G/5G GPS tracker, a small GPS tracker for car, is wire-free and easy to hide and secure. Set-up is a breeze, making it ideal as an auto GPS tracker and you’ll be tracking your car, trailer, jet-ski, or motorcycle within minutes with our wireless, portable GPS tracking device.
- RUGGED AND DURABLE: Featuring an IP67 waterproof case, the Yabby3 automotive GPS tracker is designed to last. This weatherproof and dustproof housing guarantees the device will keep working when you need it to, making it an ideal discreet GPS tracker.
Overview
- Brand : LoneStar Tracking
- Special Feature : Waterproof, Weatherproof
- Connectivity Technology : Cellular
- Supported Application : GPS
- Specific Uses For Product : Tracking Assets
Details
This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.
Shipping & Returns
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.
We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.
Shop The Full Collection